|
|
February 19, 2023: The man monitoring the couplers is having some sort
of conversation with the engineer today. The locomotive is a Bachmann On30
Heisler converted to On3. |
|
|
March 9, 2023: Wiring to headlights is ready. |
|
|
March 16, 2023: Once I have the two units I longed for, I am no longer
content to move beyond that. |
|
|
March 20, 2023: According to my records, it was 1986 when I built our own
front deck to convert an early model product to a later model, and after
many twists and turns since then, Unit 50 was finally completed. |
|
|
April 1, 2023: Boiler house, after this the boiler house needs to be fixed
to the layout and the steam supply pipes to the engine house and blacksmith
shop need to be installed. |
|
|
|
|
|
|
|
|
|