|
|
May 7, 2023: Duesenberg is completed. |
|
|
May 7, 2023: The completed Duesenberg was placed in the f engine house
lining. The CHB masterpiece donkey engine, which had been placed there,
was moved to the side of the entry line to the engine house. I was trying
to figure out how to deal with narrow space surrounded by the entry line
and the engine house, but the placement of this donkey engine has increased
the density considerably. |
|
|
May 25, 2023: I was able to look into the engine facility area from the
back side because I had to move the module temporarily for a construction
project. |
|
|
May 30, 2023: I added an apparently underscaled tender to the scrap pile
behind the engine house. |
|
|
May 30, 2023: You have to get into the back to get this angle of view. |
|
|
|
|
|
|
|
|
|